Skip to content
Roadmap

Built in the open, in phases

The web planner is live, and the iPhone, iPad and Mac app is coming to the App Store. Branded catalogs come next. Manufacturing output comes later, as a separately validated track — we won't promise CNC-ready files before they've been built in a real shop.

  1. Phase 0 · Foundation

    Shipped
    • –Project and catalog schema v0.1
    • –Millimetre units and coordinate conventions
    • –Procedural base, wall and tall cabinet geometry
    • –Licence register for every dependency and asset

    Done when: One parametric cabinet renders identically in plan, elevation and 3D, and survives save/reload.

  2. Phase 1 · Designer MVP

    Shipped
    • –Generic starter, North America and Europe catalogs
    • –Base, wall, tall and appliance placement
    • –Wall and neighbour snapping
    • –Cabinet inspector, undo/redo, keyboard shortcuts
    • –RoomPlan scan import from the iPhone & iPad app

    Done when: A user can accurately reproduce a measured galley or L-shaped kitchen.

  3. Phase 2 · Kitchen intelligence

    Shipped
    • –Automatic fillers (gaps up to 150 mm)
    • –Automatic worktops, toe-kicks and end panels
    • –One wall, galley, L, U and L + island starter layouts
    • –Per-wall elevations with dimension chains
    • –Clearance, door swing and collision checks

    Done when: Straight, L, U, galley and island layouts produce correct worktops, fillers and design checks.

  4. Phase 3 · Sales & documents

    In progress
    • –Item list and cabinet schedule CSV (shipped)
    • –Running planning estimate (shipped)
    • –Plan, elevation and item list print/PDF (shipped)
    • –Share links that carry the design in the URL (shipped)
    • –GLB, PNG, USDZ and OpenPlan3D JSON export (shipped)
    • –iPhone, iPad & Mac app on the App Store (submitted, release pending)

    Done when: A designer can produce a customer-ready proposal without another application.

  5. Phase 4 · Open catalog ecosystem

    Next
    • –Branded manufacturer catalogs, with permission
    • –Catalog authoring and import tool
    • –Catalog validation and versioning
    • –Localisation and multi-currency
    • –Optional hosted catalog registry

    Done when: A third party can publish a catalog without changing application code.

  6. Phase 5 · Manufacturing beta

    Later
    • –Construction recipes and part decomposition
    • –Cut lists, labels and sheet optimisation
    • –DXF part export
    • –Experimental machine post-processors

    Done when: Outputs are reviewed and physically built by cabinetmakers. CNC stays beta until tested per machine.